11、Research on Bearing Replacement Layout of High Pier Longitudinal Slop Continuous Bridge Based on the Seismic Response,International Conference on Earthquake Engineering--the 1st Anniversary of Wenchuan Earthquake.May.10-11,2009,Chengdou,P.R.China(CPCI)
12、河南甄坟沟大桥支座更换布置方案研究,施工技术,2009,38(7)(核心)
13、城市干道人行天桥结构选型研究,Proceedings of the Third International Forum on Advances in Structural Engineering.Nov.13-15,2009,Shanghai,P.R.China
18、Effect of hangers on structural behaviour of a concrete-filled steel tubular arch bridge,The 6th International Conference on Arch Bridges. Oct.11-13,2010, Fuzhou, P.R.China