[2] Yuan Jinjiang, A note on the complexity of single-machine scheduling with a common due date, earliness-tardiness, and batch delivery costs, European Journal of Operational Research, 94(1996), 203-205.
[3] Yuan Jinjiang, Z.H. Liu, C.T. Ng and T.C.E. Cheng, Single machine batch scheduling problem with family setup times and release dates to minimize makespan, Journal of scheduling, 9(2006), 499-513.
[4] T.C.E. Cheng, C.T. Ng and Yuan Jinjiang, The single machine batching problem with family setup time to minimize maximum lateness is strongly NP-hard, Journal of Scheduling, 6(2003), 483-490.
[5] Yuan Jinjiang and Q. Wang, Partition the vertices of a graph into induced matchings, Discrete Mathematics, 263(2003), 323-329.
[6] T.C.E. Cheng, C.T. Ng, Yuan Jinjiang and Z.H. Liu, Single machine parallel patch scheduling subject to precedence constraints, Navel Research Logistics, 51(2004), 949-958.